Public sources / INT

Open Science Framework · OSF

Consult OSF projects, preregistrations and preprints, identifying resource type and version. The announced Projects transition starts on 16 November 2026; see the documented schedule in the profile.

Consultation of scientific publications and bibliographic references.

AI-generated illustration

Read this source in practice

Does the current project preserve the pre-analysis plan?

OSF distinguishes Projects from Registrations. The announced Projects transition does not replace the registered plan or the history of declared updates: read these objects separately.

Checks to perform

  1. Keep preregistration ID and date.
  2. Read plan and associated updates.
  3. Link analysis to the file/version used.

Schedule announced by the service, consulted on the stated date. It is not an observation that the changes have been implemented.

On a small screen, scroll the table horizontally to read all columns.

OSF announced schedule, reference consulted on 1 November 2026
Announced dateAnnounced changeScope
2026-11-16No new Projects or Components.Registrations and Preprints keep their separate workflows.
2027-02-19Projects and Components become read-only.Existing content remains accessible under its permissions, according to the announcement.

Interpretation limit

A current file can differ from the earlier method. Registration alone does not establish adherence to the plan.

Record to retain

Dated plan, chronology, versions, declared changes and examined analysis.

Consulted reference : OSF — Projects Transition · OSF — Registrations and preregistrations · OSF — Registration Questions and Use Cases · Consulted on

Updated on :

Provenance and evidence type

Operator or reference institution
Center for Open Science
Result type
Research deposit

Compare files, version, licence and depositor. A deposit does not establish peer review or reproducibility.

    What this source helps you find

    Consult OSF projects, preregistrations and preprints, identifying resource type and version. The announced Projects transition starts on 16 November 2026; see the documented schedule in the profile.

    Limit to retain in your conclusion

    Distinguish a project file from a Registration. Announced preservation of content and identifiers establishes neither protocol adherence nor result quality.

    Useful search anchors

    • Document identifier
    • Exact query

    Fields to record when citing a result

    • Document identifier
    • Document type
    • Publication date
    • Version / revision

    Evidence record to retain

    Project or registration identifier, type, date, files and consulted version.

    Check before drawing a conclusion

    Separate planned protocol from execution; record deviations reported in the published result.

    Official reference page

    Access, download and API conditions depend on the service. Consult the official documentation and the resource terms.

    Cross-check this source in a research route

    Useful methods

    Other sources in this family

    Before export or reuse

    Coverage
    INT
    Identifiers to retain
    Document identifier · Document type · Publication date · Version / revision

    Licence and rights

    Inspect the exact resource and its terms. Being viewable does not authorise redistribution; retain the resource licence and restrictions instead of inferring them from the portal.

    Date and version

    Record consultation date, covered period, last update and version separately. For revised data, retain the file or exact extraction reference.

    What object does the result describe?

    Result unit
    Deposit, file, version and resource metadata
    Time reference to retain
    Document or deposit version, publication and modification dates.

    Documentation and access

    The web page, export and API may differ in coverage or terms. Check pagination, filters, authentication, quotas and licence for the access method used.

    Open producer documentation

    Does a DOI prove that work was peer reviewed?

    No. A DOI identifies an object. Check document type, journal, version and editorial process; datasets, preprints and reports can also have DOIs.

    How can the actual file read in a repository be cited?

    Retain record identifier, version, file and access date. Check links to other repositories; several hosts of one work do not become independent works.

    Read a data catalogue record and choose the right resource
    Sources for scientific reference verification

    DEEPER READING / PRACTICE

    Read a source profile as a starting point

    A list indicates where to look for and what limits to keep in mind. It helps to prepare a consultation but does not replace the reading of the obtained document.

    Updated on .

    Priority checks

    Select a precise question, open the source and raise the request, result and date. Compare the possibilities announced with the information actually available at the time of the consultation.

    Interpretation pitfalls

    The availability of a service and its content may vary. The directory does not turn an absent, partial or ambiguous result into a definitive response.

    Working record to retain

    The consultation report documentes the search path, document found, useful elements and reserves. The result is included in the file with its origin.